ID 503257

Archived

Street Lighting Conduit Only Unit 6 Project, Los Angeles, Ca

Los Angeles County

Owner Reference: 37169 / L1949445

Bid Date: 07/31/2019 at 10:00AM

Pre-Bid: 07/02/2019
Public Works Building, Lobby Conference Rm 150, 1149 S. Broadway, Los Angeles, CA 90015

Estimate: $2,340,950.00

The project will replace street lighting conduit to facilitate future conversion of the existing street lighting system from high voltage to low voltage. The project includes installation of conduit and pullboxes in the vicinity of 1) Royal Oak Rd and Sepulveda Blvd in Encino, 2) Sylvan St and Ben Ave in North Hollywood, 3) Laurel Canyon Blvd and Kling St, 4) Westpark Dr between Hartsook St and La Maida St in Valley Village, and 5) Benedict Canyon Dr and Clear View Dr in Beverly Hills. Outreach is due no later than 07/17/19 @ 12:00PM. Bonds required. Prevailing wages apply. MBE, WBE, SBE, EBE & DVBE goals apply. See attached.

City of Los Angeles, Public Works, CA

Janet Kwan
 (213) 847-1529
 (213) 847-1851
 Login or create an account To view email

Published 06/18/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.