ID 505730

Archived

Strother-Churchill Alley Paving and Drainage Improvements from Callejo Rd. to Ivanridge Lane Project Garland,TX

Dallas County

Owner Reference: 0839-19

Bid Date: 08/08/2019 at 03:00PM

Pre-Bid: 07/26/2019
Main St. Municipal Building (MSMB) Bluebonnet Conference Room.

City requested bids for Section 1 consists of constructing approximately 3,000 SF of concrete retaining wall, 100 LF of 24” and 27” Storm Sewer pipe by open cut, 2,100 SY alley pavement replacement, and 500 SY of driveway pavement replacement. Alley replacement will consist of pavement, sidewalks, ramps, sodding and signs. Bonds required. Prevailing wages.Q&A due by 08/01/19 at Noon.

City of Garland, Texas

Teresa Smith
 (972) 205-2421
 (972) 205-2495
 Login or create an account To view email

Published 07/10/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.