ID 498857
Archived
Clark County
Owner Reference: 161-19 / 2018-02-3234
Bid Date: 06/13/2019 at 02:00pm
Pre-Bid: 05/22/2019
City Hall, 240 Water Street, Henderson, Nevada
All work is located at Lake Las Vegas, on the North Shore on Summer House Drive. Items to be constructed include: wet well, dry well, meter vault, pigging station vault, 10" diameter force main, sewer manholes, a chemical feed system, CMU building, emergency generator, appurtenant electrical wiring and controls, asphalt paving, 32’ wide swing gates, and a 8’ high CMU decorative wall. Bonds required. Prevailing wages apply.
City of Henderson, Nevada
Greg Radig, P.E.
(702) 267-2532
Login or create an account To view email
Published 05/10/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.