ID 501129
Archived
Carroll County
Owner Reference: 100419-82
Bid Date: 06/25/2019 at 10:00am
Pre-Bid: 06/11/2019
Carrollton City Hall 315 Bradley Street Carrollton GA 30117
The Tanner Street & City Hall Avenue Drainage Improvements Project involves approximately 575 linear feet of new storm sewer system along both streets. Construction includes site/roadway demolition, installation, maintenance, and removal of erosion control BMP’s, minor grading, storm sewer system, modifying existing storm sewer system, roadway patching, curb and gutter patching, sidewalk patching, and grassing.
City of Carrollton
Hayley Beaver
(770) 830-2000
Login or create an account To view email
Published 05/30/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.