ID 494533

Archived

Taxiway J Temporary Bypass, Taxiway E Relocation & Partial FAA Loop Cable Relocation Pkg 6 Project, San Antonio, TX

Bexar County

Owner Reference: 33-00178

Bid Date: 06/04/2019 at 02:00pm

Pre-Bid: 05/16/2019
San Antonio International Airport, Terminal A Conference Room, 9800 Airport Blvd., San Antonio, TX 78216

Estimate: $8,300,000.00

The “Base Bid” consists of the construction of Taxiway J between the existing Taxiway connection to Runway 13R-31L and Taxiway RC. Construction site preparation elements include demolition of approximately 350-feet x 40-feet of existing Taxiway J, full depth asphalt concrete (AC) pavement and cement treated base (CTB) material removal. Demolition materials will be disposed of offsite. The “Base Bid” also consists of the demolition and relocation of Taxiway E, east of Runway 4-22. Construction site preparation elements include demolition of approximately 750-feet x 40-feet of existing Taxiway E, to include taxiway pavement removal and removal of edge lighting. Taxiway pavement demolition includes full depth AC pavement and CTB material removal. Demolition materials will be disposed offsite. Bonds required. Prevailing wages apply.

City of San Antonio, TX

Maria Godina
 (210) 207-1688
 Login or create an account To view email

Published 05/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.