ID 519631

Archived

Traction Power Substation Replacement Program Project, Atlanta GA

Fulton County

Owner Reference: 38297

Bid Date: 03/04/2020 at 02:00pm

Pre-Bid: 12/11/2019
MARTA Headquarters 244 Piedmont Rd., NE Atlanta GA 30324

IFB B38297 – Traction Power Substation Replacement Program North & South. MARTA is seeking qualified Bidders to perform renovation and replacement of existing traction power equipment at Traction Power Substations (TPSS) and Gap Breaker Stations (GBS) at North and South Locations along Red Line and Gold Line.

Metropolitan Atlanta Rapid Transit Authority

Rachel Wilson
 (404) 848-5918
 Login or create an account To view email

Published 11/19/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.