ID 524994

Archived

Traffic Signal Battery Backup System Replacement Project Rancho Cucamonga,Ca

San Bernardino County

Owner Reference: FY 19-20

Bid Date: 02/25/2020 at 02:00pm

Pre-Bid: 02/04/2020
conference room of the Rancho Cucamonga PW servicees center, 8794 Lion St. Rancho Cucamonga,Ca 91730

Estimate: $270,000

Removal of existing Battery Backup Systems (BBS) from project sites and replace with new Clary Corporation BBS to include cabinet, inverter, power interface module, batteries, etc. plus other related work.Bonds required. Prevailing wages. Q&A due by 02/11/20 at 5PM.

City of Rancho Cucamonga

Ernest Ruiz x 4108
 (909) 477-2730
 909.477.2741

Published 01/14/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.