ID 527472

Archived

Tumwater Fishway Entrance Structure Foundation Maintenance Project, Chelan Co WA

Chelan County

Owner Reference: 19-87

Bid Date: 02/18/2020 at 02:00pm

Pre-Bid: 02/10/2020
Bidders must meet the Project Manager, Justin Fletcher, at the District’s Leavenworth Headquarters Building, 222 Chumstick Highway, Leavenworth, WA Site visit will continue at Tumwater Dam located at approximately 13855 US 2, outside of Leavenworth, WA 98826. PPE required.

Estimate: $350,000

Contractor to provide labor, equipment, materials, supervision and other incidental items to remove snow, provide traffic control & access to the work area; remove & reinstall fencing and other items; install river diversion material, formwork, turbidity boom, and cementitious grout to perform underwater grouting for void repair & scour protection.

Chelan County PUD No 1, WA
 (509) 661-4479

Published 02/04/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.