ID 517574

Archived

Upper Broadway Bike Lanes And Storm Drain Replacement Project, Placerville, CA

El Dorado County

Owner Reference: 41508 / 42004

Bid Date: 11/21/2019 at 02:00pm

Pre-Bid: 11/13/2019
Town Hall 549 Main Street, Placerville, CA

Estimate: $4,500,000

The City of Placerville is inviting bids for all labor, tools, equipment, and expenses to provide a bike lane on eastbound Broadway; construction of curb, gutter and sidewalk in select locations; widening the roadway to accommodate the new bike lane and pedestrian facilities; construction of retaining walls in various locations; and pavement rehabilitation and reconstruction. Other items or details not mentioned above, that are required by the Plans, Standard Specifications, or these Special Provisions, shall be performed, constructed or installed. Bonds required. Prevailing wages apply. Time to complete is 165 working days.

City of Placerville, Public Works/Engineering, CA

Rebecca J. Neves
 (530) 642-5250
 (530) 642-5228
 Login or create an account To view email

Published 10/31/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.