ID 499080

Archived

Waldenwood Lift Station Replacement Project, Bothell WA

Island County

Bid Date: 05/30/2019 at 02:00pm

Pre-Bid: 05/22/2019
Silver Lake Water & Sewer District, 15205 41st Avenue SE, Bothell, WA 98012

The project shall include the demolition of the existing lift station dry pit and modification of the existing wet well. Work will also include the construction of a new concrete wet well and dry pit, and the construction of a CMU control and generator building. New horizontal centrifugal pumps will be installed in the new dry pit. The work includes the construction of a new valve vault and new force main connection to the existing force main. The project shall also include bypass pumping, the installation of electrical and controls, the relocation of the existing standby generator; the relocation of the electrical service and site work, including asphalt resurfacing and fencing; and all related work for a complete and operable system. 240 working days.

Silver Lake Water & Sewer District

Eric Delfel, Gray & Osborne
 (425) 337-3647

Published 05/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.