Wastewater Lagoon Repair Project, Boise ID

Boise County

Owner Reference: 20-071

Bid Date: 04/13/2020 at 02:00pm

Pre-Bid: 04/06/2020
Idaho State Correctional Center facility, Boise, Idaho

Estimate: $1,750,000

A description of the work of this project can be summarized to include removal of existing lagoon liner, excavation and earthwork placement, new liner installation, and bypass pipe installation at the Idaho State Correctional Center wastewater treatment system operated by the Idaho Department of Correction. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work.

State of Idaho, PW

Lindsay Erb
 (208) 332-1901
 (208) 334-4031
 Login or create an account To view email

Published 03/30/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.