ID 500599
Archived
Montgomery County
Owner Reference: Contract 1-2019
Bid Date: 06/20/2019 at 02:00pm
Pre-Bid: 06/06/2019
Magnolia City Hall, 18111 Buddy Riley Boulevard, Magnolia, TX 77354
Estimate: $8.5M to $9.5M
The Work includes a new 5.2 million gallon per day (mgd) influent pumping station, concrete influent channel and splitter structure; a 0.75 mgd activated sludge treatment unit consisting of aeration, clarification, and aerobic digestion; blowers; cloth disk filters; a concrete chlorine contact tank; a chemical building; an electrical building; existing treatment unit modifications; associated demolition; associated electrical; underground piping; and mechanical work. This Project is expected to be funded in part with funds provided by the United States Department of Agriculture, Rural Utilities Service (RUS). RUS requirements will apply to the Project. Bonds required. Prevailing wages apply.
City of Magnolia, TX
Laura Roberts
(608) 251-4843
(608) 251-8655
Login or create an account To view email
Published 05/26/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.