ID 528298

Archived

Water Distribution System Phase 2 Project, Chandler AZ

Maricopa County

Owner Reference: 19-001

Bid Date: 03/09/2020 at 01:00pm

Base Bid construction of 1,087 linear feet of 6 inch AWWA C900, DR 18 PVC Water Pipe, 11,614 linear feet of 4 inch AWWA C900, DR 18 PVC Water Pipe, 42 - ï½" water services with meters, 7 - ï½" water services without meters, valves, fittings and appurtenances together with the construction of 1,209 linear feet of 6 inch AWWA C900, DR 18 PVC Water Pipe, 650 linear feet of 3 inch AWWA C900, DR 18 PVC Water Pipe, 2 - ï½" water services with meters, 3 - ï½" water services without meters, valves, fittings and appurtenances as 2 Additive Bids. Bids will be received for a single prime Contract.

Antelope Peak Domestic Water Improvement Dist, AZ

William E. Collings, D.N.A.
 (520) 836-5501
 Login or create an account To view email

Published 02/11/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.