ID 526428

Archived

Water System Optimization Project Lynwood,CA

Los Angeles County

Bid Date: 02/27/2020 at 10:00AM

The Design-Builder selected will provide services to assist in the identification, evaluation and implementation of energy efficiency opportunities within their water distribution system. Based on the pump test data collected from City, Lincus developed an energy-efficiency plan to implement at the site. The proposed Energy Efficiency Measures (“EEMs”) are:EEM 1: Industrial Pump System Overhaul (PM-10485)EEM 2: Well Pumps Sequencing (PM-16109). Q&A du eby 02/13/20.

City of Lynwood

Thomas Thornton
 (310) 603-0220
 (310) 885-9537
 Login or create an account To view email

Published 01/28/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.