ID 499333
Archived
King County
Owner Reference: 2018-075
Bid Date: 06/05/2019 at 02:00pm
Estimate: $2.3M - $2.6M
This project constructs seismic retrofits to address seismic deficiencies of the West Howe Street Bridge structure. Retrofit measures include clearing and grubbing, steel column strengthening, steel bracing strengthening, column base strengthening, gusset plate, replacing existing rocker bearing with elastomeric bearings, seat extension and catcher block at west and east abutment and stop block at each side of the stringer at east abutment. This project also includes bridge painting of the existing and the new steel members. The painting of existing bridge includes cleaning, removing rust, spot priming and painting exposed steel members of the existing bridge. Owner anticipates some of the existing paint is lead based. The traffic control detour covers Magnolia Blvd W from the N at W McGraw Street to the S at the shoreline, from the E at Clise Place W and to the W at Montavista Pl. W.
City of Seattle (SDOT), WA
Ehelnesh Woubetu
(206) 733-9630
(206) 615-1237
Login or create an account To view email
Published 05/15/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.