Winding Brook Flood Mitigation Project, Middletown NY

Ulster County

Owner Reference: 2063248

Bid Date: 02/25/2020 at 10:00AM

Pre-Bid: 02/18/2020
Town Hall, 99 Tower Drive, Building A, Middletown NY 10941.

The Winding Brook Flood Mitigation Project consists of the following: Coordinate with the Town of Wallkill DPW and local utility companies to prevent interruption of services during construction. Furnish and install precast concrete box culvert with natural stream bottom. Furnish and install precast wing walls. Furnish and install 18” HDPE pipe and two (2) new precast catch basins to replace existing 18” RCP storm drain. Furnish and install 6” DIP water main to replace existing 6” AC water main at the stream crossing. Furnish and install 8” DIP sewer main to replace existing 8” sewer main at the stream crossing. Regrade stream channel. Place Rip-Rap. Remove and replace existing guide rail with box beam guard rail. Restore pavement. Maintenance and protection of traffic. Each bid shall be accompanied by an acceptable form of Bid Guarantee in an amount equal to at least 5% of the amount of the Bid, payable to the Town of Wallkill as a guarantee that if the Bid is accepted. This project encouraged MBE/WBE participation.

Town of Wallkill

Michele Baker
 (845) 692-7831
 (845) 692-2546
 Login or create an account To view email

Published 02/13/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.