ID 491654
Archived
King County
Owner Reference: C01208C18
Bid Date: 04/16/2019 at 01:30pm
Pre-Bid: 03/25/2019
Rainier Conference Room, and 03/27/2019, 1:00 pm, Cascade Conference Room, West Point Treatment Plant (WPTP), 1400 Utah St W, Seattle,
WA 98199.
Estimate: $1,450,000
Scope includes modifications to piping for installation of new flow control, isolation valves and above-grade air gaps, improvements to construction site access trail, structural separation of the existing C1 and C2 reservoir vaults including piping, installation of temporary water connections, installation of new access hatches, modification of mechanical room entrance, installation of controls and electrical to monitor equipment, trenching and installation of 450 feet of overflow drain line, pedestrian pathways during construction, protection and restoration of vegetation, regrading of soil, and all other work
County of King, WA
Trisha Roth
(206) 263-1964
Login or create an account To view email
Published 03/13/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.