ID 503987

Archived

WTP #1 Electrical Improvements Project, Kingsland GA

Camden County

Owner Reference: K5000-119

Bid Date: 07/25/2019 at 01:00PM

Replace the MCC and other electrical components at Water Treatment Plant #1 with new equipment in an existing space in another building. Work includes demolition and removal of existing equipment; installation of new electrical equipment; HVAC and lighting installation; concrete support pad installation; conduit, wiring, equipment and fixtures; any other electrical and mechanical service work; providing temporary generator power as needed; and all other incidental items as required to complete the work.

Kingsland City Hall, GA

Lee Spell
 (912) 729-5613
 Login or create an account To view email

Published 06/24/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.