Date Of Advertisement: Dec 06, 2018

Steve P. Rados, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE
sub-contractors and/or material suppliers for the following project:

Rte 10 Santa Ana River Bridge Retrofit
Colton, CA
Located in Los Angeles County, CA

Owner: CALTRANS

Bid Date: Dec 18, 2018  at  02:00 PM

We are requesting bids for the following trades and/or material suppliers:
We are trying to obtain the highest possible participation of DBE suppliers & subcontractors for the following supplies & items of work, but not limited to: concrete & cement, reinforcing bar section, steel, pipe, pavement markers, traffic control materials, construction area signs, traffic control system, remove bridge item, modify bridge item, structure excavation, structure backfill, temporary erosion control, aggregate base, concrete pumping, groove & grind pavement, cast-in-drilled -hole concrete piling, minor concrete structure, concrete surface finish, concrete overlay-drill & bond, core concrete-repair bridge deck, joint seal-water stop, reinforcing steel, structural steel plate pipe, arch, & pipe arch, corrugated metal pipe (CSP), concrete curb & sidewalk-misc., thermoplastic traffic striping & marking, painted traffic striping & marking, pavement marking, SWPPP planning, bottom dump trucking, transfer dump truck, super 10 dump truck, end dump truck, demolition

Bid documents can be viewed at or obtained from:
www.ca.gov/des/oe/contract-awards-services-html Plans & specs can be dowlnloaded from this website or call STEVE P. RADOS INC. AT TEL 714-835-4612to schedule plans & specs viewing at our office at 2002 E. McFadden Ave., Ste 200, santa Ana, CA

Engineer's Estimate: $14 Million Steve P. Rados, Inc. (SPR) is an Equal Opportunity Employer and a signatory union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions, and insurance requirements. SPR’s listing of a subcontractor is not to be construed as an acceptance of all subcontractor’s conditions or exceptions included with the subcontractor’s quotes. Subcontractors will be required to provide payment & performance bond from an approved surety company for 100% of the value of the subcontracted work. SPR will pay bond premium up to 1.5%(optional). We will split items of work and provide assistance for obtaining bonds, lines of credit and/or insurance. Assistance is available in obtaining necessary equipments, supplies, materials & related assistance or services. SPR requires that subcontractors and suppliers price quote be provided at a reasonable time prior to bid to enable a complete evaluation.

Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana, CA 92705

Phone: (714) 835-4612  Fax: (714) 835-2186
Email: rschneider@radoscompanies.com
Robert Schneider

Published Dec 06, 2018 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573

This solicitation Ad will be archived 30 days after the bid date

The social media bar for sharing on facebook or twitter is un-available when logged in.

To use the social media bar, please log out.