ID 641600

Archived

Alley Reconstruction - Chandler Dr, Piedra Dr, Brunchberry Ln, Northcrest Dr, & Karen Ct, Plano, TX

Collin County

Owner Reference: 2022-0698-B

Bid Date: 10/10/2022 at 01:00PM

Pre-Bid: 09/28/2022
SKYPE MTG PHONE NO. 972-941-5885 & CONF. ID 9201272

Estimate: $1,959,400

Trades: General Engineering Contractor GEC, Construction Zone Traffic Control: Vehicle Guides, Barricades, Barriers, Guardrail Attenuators, Crash Cushions, Bollard Systems

The City of Plano is soliciting traffic control – 1 LS; Site Preparation – 1 LS; Unclassified Excavation 1810 – CY; Remove and Recycle Concrete Alleys – 7880 SY; Remove and Recycle Concrete Driveways – 910 SY; Remove and Recycle Concrete Sidewalks – 90 SY; Concrete Sidewalk – 90 SY; Flexible Base (6-in) – 9660 SY; Concrete Drive Approach – 910 SY; Reinforced Concrete Pavement- 8680 SY; Curb & Gutter (Intregal)(Standard)(6-in) – 1240 LF; Barrier Free Ramps – 18 EA; Topsoil – 1950 SY; Block Sodding – 1950 SY; Mobilization – 1 LS; as well as miscellaneous other construction. Bonds required. Prevailing wages.

City of Plano, TX

Stephanie Shaffer
 (972) 941-7120
 (972) 941-0318
 Login or create an account To view email

Published 09/21/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.