ID 725912
Archived
Winnebago County
Bid Date: 11/08/2024 at 12:00pm
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Structural Steel & Steel Erection Contractor, Portland Cement Concrete
This project consists of removing the existing structure SN 101-0100, a non-composite three-span continuous steel beam bridge, with a three-span continuous PPC bridge. The bridge width will be reduced and the excess width will be retained with Permanent Sheet Piling. The bridge length has been extended. The bridge will be closed and traffic will be detoured. The multi-use path under the bridge will be maintained. This project will also include full-depth HMA pavement and shoulder reconstruction adjacent to the bridge. DBE 2%. Bonds required. Prevailing wages.
State of Illinois Department of Transportation (ILDOT) IL
IDOT Contracts Office
Login or create an account To view email
Published 10/09/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.