ID 729283
Archived
Grady County
Owner Reference: CVE24-014
Bid Date: 11/06/2024 at 11:00am
Pre-Bid: 10/29/2024
Estimate: $950,000.00
Trades: Stormwater Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk/Pollution Reduction, Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *Landscaping Contractor: Grounds Weed Control Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Sand and Gravel NIGP 750-77, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners
Mobilization, Bonding and Insurance for Sewer Main Relocation. 2 SWPPP and Erosion Control for Sewer Main Relocation. 3 Traffic Control and signing in accordance with the Manual of Uniform Traffic Control Devices for Sewer Main Relocation. 4 Clearing, grubbing and Miscellaneous Incidental Removals of Structures and Obstructions, Repair and Restoration of Existing Fencing. 5 Provide trench safety per OSHA and other applicable standards for all work outlined in the plans and specifications. 6 Install, Pipe Burst, and Furnish 10" PE SDR 17 including all excavation, labor, backfill, fusion, and incidentals thereto. 7 Install, Pipe Burst, and Furnish 8" PE SDR 17 including all excavation, labor, backfill, fusion, robotic service connection, and incidentals thereto. 8 Install and Furnish 10" Cured-In-Place Pipelining including all materials, labor, backfill, curing, robotic cutting of services and connections, pre- and post- camera inspections and incidentals thereto. 9 Furnish & Install 4' Concrete Manhole 0-6 feet deep including all excavation, backfill, concrete, steel, ring, cover, interconnections with existing and proposed mains, and appurtenances. 10 Construct Additional Depth for Standard 4' Dia. Concrete Manhole including but not limited to excavation, backfill, forming, concrete, reinforcement and appurtenances. 11 Remove and Dispose existing manhole ring, cover and appurtenances. 12 Connect Existing Sewer Service Connection including fittings, trench excavation, laying, backfill and appurtenances. 13 Saw Cut, Remove and Replace Asphalt Paving w/ Concrete, and Reinforcing Steel. 14 Gravel Repair, including removal and replacement of at minimum of 6" crusher run driveway gravel. 15 Provide testing of all sewer main construction and manholes in accordance with ASTM. 16 Pre- and Post Construction CCTV Inspection, to verify locations of sewer service connections, and confirm quality of installation 30 days after project completion. Point Repair, to repair sags in existing piping alignment, including excavation, backfill, embedment material, fusion, and grade correction. Bermuda Grass Sodding including furnishing, fertilizing, establishment, supplemental watering, and incidentals thereto. Trenching and installation of 8-inch PVC SDR 26 in lieu of pipe bursting. Trenching and installation of 10-inch PVC SDR 26 in lieu of pipe bursting. Bonds required. Prevailing wages.
City of Minco
Matthew Coe c/o Cimarron Valley Engineering, LLC
Login or create an account To view email
Published 11/04/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.