ID 744973
Archived
Arapahoe County
Owner Reference: RFQ-TM-2022-0000000025
Bid Date: 03/13/2025 at 02:00pm
Trades: *Construction Management; General Contractor "CMGC", Construction Manager-as-Constructor "CMaC", & Construction Administration
In a 14' x 14' space located within a park and near the playground (exact location to be determined), remove existing turfgrass and regrade area, performing any necessary excavation to ensure concrete pad is level and plumb. Pour concrete pad and install a single-tier 24-gauge steel shelter having a powder coat finish. (See attched pdf for image of tyoe of shelter required). Protection and care must be taken for all grass, sprinkler systems, sidewalks, parking lot and lights in the area. The concrete pad must have proper water drainage. All debris must be removed. Because the job site is located within the City of Centennial, CO any and all necessary permits must be obtained. If you would like to view the site, feel free to contact either Tom Mehl or Jude Buemi by E-mail: or phone. The Smoky Hill Metropolitan District is exempt from Colorado state sales tax. The Park main (South) entance is at 18363 E Crestline in Centennial CO. Installation site will be adjacent to the playground area of the park
Smoky Hill Metropolitan District CO
Tom Mehl
Login or create an account To view email
Published 02/19/2025 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.