ID 750083
Archived
Marion County
Owner Reference: CIP/250467
Bid Date: 04/16/2025 at 02:00pm
Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The City of Ocala requires the services of an experienced Contractor to complete the widening construction of the existing two-lane SW 44th / 46th Avenue from SR 40 to SW 20th Street to create a four-lane divided roadway. Scope of the project will contain stabilization, base, milling and asphalt for four 12-foot travel lanes, 6-foot-wide traffic separator, grass median, 4-foot-wide bike lanes, concrete sidewalks, concrete curb and gutter, curb ramps, sod, gravity wall, as well as signing and thermoplastic pavement marking. Driveway modifications are also anticipated. Drainage work includes manhole and inlet top modifications as called out in the plans. Inlet protection system, sediment barrier is also included. Construction activities include mobilization, maintenance of traffic, clearing and grubbing, earthwork, milling, concrete, and paving. All pedestrian facilities must adhere to current ADA standards. Proper maintenance of traffic is required at all times. Contractor is responsible for providing all materials, labor, and equipment to complete the project.
City of Ocala FL
Eileen Marquez
Login or create an account To view email
Published 03/21/2025 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.