ID 751440
Archived
Benton County
Owner Reference: 25-04
Bid Date: 04/24/2025 at 02:00pm
Pre-Bid: 04/09/2025
1000 Columbia Park Trail, Richland, WA 99352 Meet in the Administration Building Lobby for sign in. We will walk over to the site. Please bring a safety vest to wear while attending the Pre-Bid Meeting.
Trades: (EV) Terminal Charging: Electric Vehicle Charging Stations (EVCS); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or
BFT is requesting bids for the installation of two EV Charging Units at our 1000 Columbia Park Trail, Richland, WA location. The project consists of providing site work and electrical distribution for the install of two (2) ChargePoint Express Plus 200kW Chargers with two (2) ChargePoint Express Dispensers, adjacent to the existing bus wash building. Additional utility service upgrade to a 750kva transformer will be required. The ChargePoint Express units will be furnished by BFT. Bonds required. Prevailing wages.
Ben Franklin Transit (BFT) WA
Joe Willis
Login or create an account To view email
Published 03/29/2025 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.