ID 754434

Archived

Construct a Shared-Use Path & Roadway Reconstruction at Various Locations, Park Forest, IL

Cook County

Owner Reference: 61L06

Bid Date: 04/25/2025 at 12:00pm

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The work consists of full depth pavement removal, full depth pavement replacement, the installation of PCC sidewalk, installation of a shared use path, replacement of drainage pipes and structures, replacement of sanitary sewers and ADA curb ramps with detectable warning plates as well as all incidental and collateral work to complete the project as shown on the plans and described herein. The project is located on Forest Boulevard from Indianwood Boulevard to Norwood Boulevard and on Norwood Boulevard from Forest Boulevard to Westwood Drive. The gross and net length of the project on Forest Boulevard is 3,258 feet (0.62 miles) and the gross and net length on Norwood Boulevard is 912 feet (0.17 miles). The project is located in Sections 25 and 36 of Township 35 North, Range 13 East in the Village of Park Forest in Cook County, Illinois. Prevailing wages.

State of Illinois Department of Transportation (ILDOT) IL
 IDOT Contracts Office
 Login or create an account To view email

Published 04/15/2025 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.