ID 758547

Archived

Phase 2 and 3 Water System Improvements Completing the Four Production Wells Constructed in Phase 1, Worden, MT

Yellowstone County

Owner Reference: 2-16103 TO3

Bid Date: 06/03/2025 at 02:00pm

Pre-Bid: 05/15/2025
District office at 2449 Main Street, Worden, MT 59008

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras

The project consists of two phases and two additive alternatives. Phase 2 consists of completing the four production wells constructed in Phase 1. The completion of the production wells will include power to site, installing the well pump and pitiless unit, completing the electrical and controls, constructing a wellhouse for the wells, installing all interior and exterior piping, providing chlorination as disinfection, and connecting the new wells to existing distribution system. Phase 3 consists of installing approximately 1,200 linear feet of new 10-inch PVC water main and approximately 3,000 linear feet of new 8-inch PVC water main under the railroad and Highway 312. Phase 3 also includes horizontal directional drilling approximately 700 linear feet of the new steel casing underneath the Burlington Northern Santa Fe (BNSF) railroad and Highway 312. Additive Alternative 1 consists of installing approximately 1,000 linear feet of 8-inch PVC water main on 2nd St. in Worden. Additive Alternative 2 consists of approximately 750 linear feet of 8-inch PVC water main on Northern Ave in Worden. Bonds required. Prevailing wages.

Worden-Ballantine Yellowstone County Water and Sewer District
 Tyler Burns
 Login or create an account To view email

Published 05/06/2025 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.