ID 758557
Archived
Yellowstone County
Owner Reference: 2-16103 TO3
Bid Date: 06/05/2025 at 02:00pm
Pre-Bid: 05/15/2025
District office at 2449 Main Street, Worden, MT 59008
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
The project consists of improvements to the Worden-Ballantine water distribution system. The improvements include the replacement of approximately 2,920 linear feet of existing 6-inch asbestos cement (AC) water main with 2,920 feet of new 10-inch polyvinyl chloride (PVC) water main, the replacement of approximately 2,730 feet of existing 4-inch AC water main with 2,730 feet of new 10-inch PVC water main, and the addition of 1,260 linear feet of new 10-inch PVC water main. This also includes the installation of new water services, valves, and fire hydrants. All water services will be replaced from the main to the curb stop with PE service line. Bonds required. Prevailing wages.
Worden-Ballantine Yellowstone County Water and Sewer District
Tyler Burns
Login or create an account To view email
Published 05/06/2025 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.