ID 761918

Archived

2025 Pavement Maintenance Project, Troutdale, OR

Multnomah County

Bid Date: 06/05/2025 at 02:00pm

Trades: Earthwork & Paving Contractor: Road Resurface, Seal Coat, High Friction Treatment, Milling, Asphalt, Land Clearing, Trails/Path, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras

The work to be done consists of three phases of Pavement Maintenance treatments: street pavement reconstruction, slurry sealing, and asphaltic pavement repair. The street pavement reconstruction phase consists of: • Removal of approximately 2,354 square yards of 2” – 4” deep existing surfacing • Approximately 687 cubic yards of general excavation • Removal and replacement of approximately 5 feet of 18-inch concrete storm pipe, 3-foot depth • Installation of approximately 834 tons of 1”-0 aggregate base • Installation of approximately 642 tons of level 2, ½” ACP The street reconstruction phase shall have a 21 calendar day performance time and must be completed not later than August 29th, 2025. The slurry seal phase consists of asphaltic pavement surface preparation and application of Type II Slurry Seal on approximately 61,000 square yards of City of Troutdale streets. The slurry sealing phase shall have a 30 calendar day performance time and must be completed not later than August 29th,2025. The asphalt pavement repair phase consists of approximately 500 squareyards of 4” asphalt concrete pavement repair. The asphalt pavement repairsto each given street must be completed before the slurry seal can be applied. The asphalt pavement repair phase shall have a 60 calendar day performance time. All work must begin no earlier than July 1st, 2025 Prevailing wages.

City of Troutdale OR
 Christopher Priano
 Login or create an account To view email

Published 05/24/2025 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.