ID 641478

Archived

Bridge Maintenance, FM 701, Young Co., TX

Young County

Owner Reference: 0570-03-021

Bid Date: 10/07/2022 at 01:00pm

Estimate: $316,320.00

Trades: Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, General Engineering Contractor GEC

This is a solicitation for contractors interested in entering into a State Let Construction Contract consisting of bridge maintenance, removal &/or replacement &/or disposal, on FM 701 at Clear Fork Brazos River in Young County. Please see attached for details. This project has bridge elements that contain lead-based paint. See attached (general notes section) for a list of members proposed for removal within the project limits that are painted with lead-containing paint. Time for Completion: 17 Working Days. DBE Goal: 0% Bonds required. Prevailing wages.

Texas Department of Transportation DOT CL Austin HQ-Riverside Annex, TX

Zachary Husen
 (940) 549-0676
 Login or create an account To view email

Published 09/21/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.