Burton Way Median Green St and Water Efficient Landscape Project, Beverly Hills, CA

Los Angeles County

Owner Reference: RFB 21-350-19

Bid Date: 05/26/2021 at 02:00PM

Pre-Bid: 05/13/2021
345 Foothill Rd., Beverly Hills, CA 90210. Masks are required.

Estimate: $9,695,000

The work generally consists of installation of surface drainage and infiltration swales, drainage pipes, force mains, pump stations, valves, subsurface infiltration structures, intersection improvements, and landscape/irrigation improvements as shown on the plans. As required, the work shall include pavement removal and reconstruction, curb, gutter and sidewalk removal and reconstruction, driveway approach removal and reconstruction, traffic striping, traffic loop installation with conduit and pull boxes, traffic control, and pressure testing. Completion time is 320 calendar days. Bonds required. Prevailing wages. Q&A due by 05/14/21 at Noon.

City of Beverly Hills P.W.

Derek Nguyen
 (310) 285-2473
 Login or create an account To view email

Published 05/23/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.