ID: 585415
Owner Reference: RFB 21-350-19
Bid Date: 05/26/2021
Pre-Bid: 05/13/2021
345 Foothill Rd., Beverly Hills, CA 90210. Masks are required.
Estimate: $9,695,000
The work generally consists of installation of surface drainage and infiltration swales, drainage pipes, force mains, pump stations, valves, subsurface infiltration structures, intersection improvements, and landscape/irrigation improvements as shown on the plans. As required, the work shall include pavement removal and reconstruction, curb, gutter and sidewalk removal and reconstruction, driveway approach removal and reconstruction, traffic striping, traffic loop installation with conduit and pull boxes, traffic control, and pressure testing. Completion time is 320 calendar days. Bonds required. Prevailing wages. Q&A due by 05/14/21 at Noon.
City of Beverly Hills P.W.
Derek Nguyen
(310) 285-2473