ID 606515

Archived

FY2022 LMIG - Widening of Old Alma-Waycross Hwy, Alma, GA

Bacon County

Bid Date: 12/14/2021 at 01:00pm

Trades: General Engineering Contractor GEC

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled FY2022 LMIG – Widening, Leveling, Overlay, and Stripping of the Old Alma-Waycross Highway. In general, the project consists of leveling, overlay & stripping of Fourth Street Extension. This project is for approximately three (3) miles of widening, leveling, overlaying & stripping from the Beach Highway to the Bacon-Ware County line. Our project will widen the roadway two (2) feet for 3.3-miles, level 3-miles with 80-pounds per square yard of leveling and overlay with a Double Surface Treatment with a sand seal and re-stripe. Any Contractor submitting a bid must be licensed by a pre-qualified Georgia Department of Transportation Contractor and must be fully insured and bonded.

Bonds required.

County of Bacon GA

Richard Foskey
 912-632-5210
 Login or create an account To view email

Published 11/03/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.