ID 590053

Archived

Mark Twain Riverfront Park, Elmira, NY

Chemung County

Owner Reference: RFB -244, HUNT 1545-107

Bid Date: 07/08/2021 at 01:45pm

The Project consists of the Renovation of the existing public park space known as Mark Twain Riverfront Park in downtown Elmira on West Water Street between Carl Proper Drive and North Main Street. The proposed improvements will be on land owned by the City between Water Street and the Existing Flood Wall. Project site improvements include the replacement of the existing fountain with a water plaza, new park furniture, adjusted grading to improve storm water drainage, improved planting areas, replacement of existing paver paths with concrete walkways, a concrete path along the flood wall and custom pattern concrete entrance path. The project site consists of approximately 1.0 acre of development space that will maintain its current function and intent. MBE goal is 15% and WBE goal is 15%. Bonds and prevailing wages

Chemung County/City of Elmira

James C Peckham
 (607) 358-1000
 (607) 358-1800
 Login or create an account To view email

Published 06/11/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.