ID: 540752

Archived Project

Montgomery Middle School - Sports Field Lighting Installation Project, El Cajon, CA

San Diego County

Owner Reference: 1542

Bid Date: 06/09/2020

The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified. Bonds and prevailing wages.

Cajon Valley Union School District (Pur)
James Beard
 (619) 588-3010
 (619) 441-0843
 Login or create an account To view email

Published 05/26/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.