ID: 613163

Archived Project

Napa Valley Vine Trail - St Helena to Calistoga, CA

Napa County

Owner Reference: -Project No. 21-04 - Federal Project No. ATPL 6510(003)

Bid Date: 01/31/2022

Pre-Bid: 01/12/2022
Register in advance for this meeting: https://countyofnapa.zoom.us/meeting/register/tZMrduuhpzsjHNxMOE7YAQxAvEB3btIGuhBO

Estimate: $9,500,000

The work generally consists of the installation of a 7.4 milelong Class I bicycle and pedestrian path in the County of Napa from Pratt Avenue in St Helena to Fairway Drive Extension in the City of Calistoga. The majority of the path runs on the east side of State Route 29. This mixed-use facility consists primarily of a 10' wide asphalt concrete path with 2' shoulders, three bridges over Deconinck Wetland, Twomey Drainage and Napa River Crossing, installation of 2 new Pedestrian Hybrid Beacon (PHB) traffic signals, signage and striping, retaining walls, fencing, new drainage structure, biological mitigation, tree removal, landscaping and irrigation. Existing drainage features and patterns will remain along the extent of the project. The work must be completed within 240 working days. The site of the Work is located along the State Route 29 from Pratt Ave at St Helena to Lincoln Ave in Calistoga.

Napa Valley Transportation Authority
Renee Kulick
 (707) 259-8780
 Login or create an account To view email

Published 01/03/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.