ID 634932
Archived
Dunklin County
Owner Reference: 220819-H03 / FAF 412-1(18)
Bid Date: 08/19/2022 at 11:00am
Estimate: $1M to $2.5M
Trades: Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, General Engineering Contractor GEC
Project description: Job J9P3586 Route 412 Dunklin County. Pavement rehabilitation from Route 25 to I-155, the total length of improvement being 31.092 miles.Contract Time: 10/1/23. Federally funded project. Bonds required. Prevailing wages.
State of Missouri Department of Transportation (MODOT) MO
Design Division - Central Office
(573) 751-2876
(573) 522-2281
Published 07/19/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.