ID 588630

Archived

Replacement of Livonia Center Rd Culvert over Kinney Creek, Livonia, NY

Livingston County

Owner Reference: D036157

Bid Date: 06/22/2021 at 01:00pm

The work will include, but not be limited to, removal of the existing twin corrugated steel pipes, replacement with a precast 4-sided concrete box culvert. The wingwalls will be cast-in-place on spread footings. There will be full depth pavement reconstruction within the limits of the project. The Contractor shall have a maximum of eighty (80) consecutive calendar days from the date Notice to Proceed is issued to complete the project and before November 12, 2021 if the project is to be completed in 2021, or before July 29, 2022 if the project is to be completed in 2022. MBE goal is 8% and WBE goal is 4%. Bonds and prevailing wages

County of Livingston NY

Chris Bayer
 (585) 295-6294
 Login or create an account To view email

Published 05/30/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.