ID 581742
Archived
Snohomish County
Owner Reference: P02.333.4
Bid Date: 04/22/2021 at 02:00PM
Estimate: $2,351,700
Work under this schedule includes the construction of a new two-lane road, 173rd St NE, between Smokey Point Blvd and 40th Ave NE, including furnishing all labor, materials, and equipment to install erosion and water pollution control; removal of existing sidewalk, pavement, and subgrade; clear and grub existing landscaping; base course placement and grading; asphalt paving; construction of stormwater conveyance and treatment facilities; constructing curb and gutter, sidewalk, ADA curb ramps; landscaping; installing illumination; installing pavement markings and signing; performing traffic control; and miscellaneous items necessary to complete the project. Bonds Required. Prevailing Wages.
City of Arlington, WA
Linda Taylor
(360) 403-3526
Login or create an account To view email
Published 04/13/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.