ID 603819

Archived

1800 North Sewer Realignment, Phase 1 – Inverted Siphon, Salt Lake City UT

Salt Lake County

Owner Reference: 525002878

Bid Date: 11/19/2021 at 02:00pm

Pre-Bid: 10/20/2021
Please join us for a virtual pre-bid meeting for 525002878 - 1800 North Sewer Realignment, Ph. 1 Inverted Siphon on Wed, Oct 20, 2021 10:00 AM - 12:00 PM (MDT) from your computer, tablet or smartphone by clicking on the following link: https://global.gotomeeting.com/join/722990277

Estimate: $7,405,389

Trades: General Engineering Contractor GEC

at:  Lat: 40.800320, Long: -111.917657, W1500N, Salt Lake City, UT 84116 B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Trenchless installation of six (6) 36” steel casings, four of which will cross under UPRR and UTA railroad corridors, and two of which will cross the UDOT (I-15) right of way and terminate in Rosewood Park. Installation of 24” FRPM carrier pipe for future gravity wastewater utility service, and one (1) 24” FRPM carrier pipe for future storm drain utility service. Installation of three (3) watertight cast-in-place underground structures for wastewater utility service and connections to 24” FRPM pipelines;. Relocation of a 12” water utility within Warm Springs Road.  400 calendar days completion.

 

Bonds required.

Salt Lake City Public Utilities

Kevin Kranedonk
 (801) 483-6841
 Login or create an account To view email

Published 10/11/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.