ID 609054

Archived

2 MG Water Reservoir Improvements, Bandon, OR

Coos County

Bid Date: 12/21/2021 at 02:00pm

Estimate: Sched A $260,000 - $325,000, Sched B $575,000 - $675,000

Trades: General Engineering Contractor GEC

The project consists of two schedules with the following major items of construction: 1. Basic Bid a. Schedule A - Seismic Protection Improvements 1. Modify the inlet and outlet piping to include a seismically actuated valve on the outlet line and check valve on the inlet line and flexible expansion joint fittings. Install new valves and fittings as shown on the Plans. 2. Inlet and outlet penetrations will be converted to above ground penetration. 3. Install, test, and instruct City Staff with regard to maintenance of a 120 V powered and battery backed seismic shut off valve system. The Contractor will need to connect power to installed equipment as shown on the Plans and Specifications. b. Schedule B - Interior Coating and Incidental Painting 1. Welded steel reservoir interior painting work includes surface preparation near white metal blast cleaning. Repaint the interior walls, floor, roof system, support columns, and all related appurtenances of the existing 2-million-gallon reservoir. Project will be substantially complete by May 20, 2022

Bonds required.

City of Bandon OR
 (541) 347-2552

Published 11/27/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.