ID 540384

Archived

2020 Pavement Maintenance Project, Happy Valley OR

Clackamas County

Owner Reference: CIP-02-20

Bid Date: 06/11/2020 at 02:00pm

Class of Work: Asphalt Concrete Paving and Oiling, and Pavement Markings This project generally includes reconstruction, repair, and overlay street improvement for eight (8) streets: Proposed work includes the following: Schedule 'A' (SE 129th Avenue) includes the following proposed work: • Pavement Grinding to Full-Depth (4"+/-): 724 +/- square yards • Cement-Treated Sub-Grade (CTB): 724 +/- square yards (22 tons PCC, 6% Application Rate) • Paving Street to 4" Thickness: 724 +/- square yards (160 tons), and • Striping: 16+/- square feet of 12" stop bar Schedule 'B' (SE Purple Finch Loop) includes the following proposed work: • Pavement Grinding up to 2" Depth: 1,300+/- square yards • Overlay Street to 2" Thickness: 2,740+/- square yards (303 tons) • Striping: 24+/- square feet of 12" stop bars • ADA Ramp Construction: Removal and construction of (4) four ramps Schedule 'C' (SE Solomon Court) includes the following proposed work: • Pavement Grinding to Full-Depth (4"+/-): 3,053+/- square yards • Paving Street to 4" Thickness: 3,053+/- square yards (672 tons) • Cement-Treated Sub-Grade (CTB): 3,053+/- square yards (93 tons PCC, 6% Application Rate) • Striping: 12+/- square feet of 12" stop bar • ADA Ramp Construction: Removal and construction of (7) seven ramps • Commercial Driveway Construction: Removal and construction of (1) driveway Schedule 'D' (SE Cresthill Road) includes the following proposed work: • Pavement Grinding to Full-Depth (4"+/-): 1,094+/- square yards • Cement-Treated Sub-Grade (CTB): 1,094+/- square yards (34 tons, 6% Application Rate) • Paving Street to 4" Thickness: 1,094+/- square yards (240 tons) • Striping: 16+/- square feet of 12" bars • ADA Ramp Construction: Removal and construction of (2) two ramps • Commercial Driveway Construction: Removal and construction of (1) driveway Schedule 'E' (SE 155th Avenue) includes the following proposed work: • Pavement Grinding to Full-Depth (4"+/-): 2,368 +/- square yards • Paving Street to 4" Thickness: 2,368 +/- square yards (515 tons) • ADA Ramp Construction: Removal and construction of (2) two ramps • Concrete Stair Construction: Removal and construction of (1) one stair • Striping: 16+/- square feet of 12" stop bar Schedule 'F' (SE 156th Avenue) includes the following proposed work: • Pavement Grinding up to 2" Depth: 2,104+/- square yards • Overlay Street to 2" Thickness: 2,104+/- square yards (231 tons) • Pavement Fabric: 18,936+/- square feet Schedule 'G' (SE Vivian Way) includes the following proposed work: • Pavement Grinding up to 2" Depth: 350+/- square yards • Overlay Street to 2" Thickness: 350+/- square yards (39 tons) • Pavement Fabric: 3,150+/- square feet Schedule 'H' (SE Nyla Way) includes the following proposed work: • Pavement Grinding up to 2" Depth: 603+/- square yards • Overlay Street to 2" Thickness: 603+/- square yards (67 tons) • Striping: 12+/- square feet of 12" bars • Pavement Fabric: 5,427+/- square feet • ADA Ramp Construction: Removal and construction of (2) two ramps

City of Happy Valley, OR
 (503) 783-3800

Published 05/23/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.