ID 580363

Archived

2021-02 Best Value Joc 30, San Jose, CA

Santa Clara County

Owner Reference: JOC CSCHS 2021-02

Bid Date: 04/23/2021 at 03:00PM

Pre-Bid: 03/30/2021
teams.microsoft.com/l/meetup-join/19%3ameeting_ZTc4M2Y1MDMtNjhjNC00NTIwLThmYmMtMDM1NOr call in (audio only)+1 408-791-0743,,812488329# United States, San Jose Phone Conference ID: 812 488 329#GE5OWM5MTc1%40thread.v2/0?context=%7b%22Tid%22%3a%220ac3202f-c3e9-4f56-830d-017d09d16b3f%22%2c%22Oid%22%3a%225409d862-db6c-475e-8fca-bf351727d786%22%7d

The Job Order Contract (JOC) is an indefinite quantity contract where the Contractor will perform an ongoing variety of individual Projects, consisting of specific construction tasks, at different locations throughout the County. This Contract is for construction work and related services to be performed within a specific area of the County. However, if the need arises, Owner reserves the right to require Contractor to work at any location or facility under the jurisdiction of Owner. The scope of this JOC Contract is for general construction, repair, remodel, and other repetitive related work to be performed for the County of Santa Clara Facilities and Fleet Department. The County has published a Construction Task CatalogĀ® (CTC) containing a series of construction tasks with preset Unit Prices. The CTC was developed using experienced labor and high-quality materials. All Unit Prices are based on local labor, material and equipment prices, including the current prevailing wages, and are for the direct cost of construction. Contractor will bid two sets of two Adjustment Factors to be applied to the Unit Prices. The first set of Adjustment Factors is for performing work in General Facilities and the second for Detention Facilities. Each set of Adjustment Factors will include Adjustment Factors for performing work during Normal Working Hours and a second Adjustment Factor for performing work during Other Than Normal Working Hours. The price of an individual project will be determined by multiplying the preset Unit Prices and the appropriate quantities by the appropriate Adjustment Factor. These Adjustment Factors shall apply to every Pre-priced Task in the Construction Task CatalogĀ®. The Adjustment Factor for non-pre-priced tasks shall apply to every task that is not pre-priced in the Construction Task CatalogĀ®. This Contract will be awarded to the best value contractor as set forth in Public Contract Code section 20155, et seq., and as detailed in Document 00 22 16 (Instructions to Proposers). Bonds required. Prevailing wages. DBE goals.

County of Santa Clara, Facilities and Fleet Department, CA

Kim Huynh
 (408) 993-4632
 Login or create an account To view email

Published 04/01/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.