ID 582070

Archived

2021 Annual Resurfacing, Phase 1, Flower Circle Reconstruction, Marina, CA

Monterey County

Bid Date: 05/04/2021 at 02:00PM

The City of Marina solicits sealed proposals for furnishing all labor, equipment, materials, and other items necessary to execute the City of Marina Annual Pavement Resurfacing 2021 Phase 1- Flower Circle Reconstruction. Flower Circle reconstruction is phase 1 of the City’s Annual Project. Flower Circle a residential routes of approximately 800’ long and 31’ wide. The work includes, but not limited to; Installation of ADA compliant curb ramps, conform curb, gutter, and sidewalk, pulverizing existing asphalt concrete pavement and full depth reclamation (cement), roadway excavation and compaction, installation of hot mix asphalt and pavement making and striping and associated miscellaneous work for a complete road reconstruction in accordance with Contract document. Flower Circle reconstruction is phase 1 of the City’s Annual Pavement Project. Flower Circle a residential pavement of approximately 800’ long and 31’ wide. The work includes, but not limited to; Installation of ADA compliant curb ramps, conform curb, gutter, and sidewalk, pulverizing existing asphalt concrete pavement and full depth reclamation (cement), roadway excavation and compaction, installation of hot mix asphalt and pavement making and striping and associated miscellaneous work for a complete road reconstruction in accordance with Contract document.

City Of Marina Engineering

Elvie Morla-Comancho, PE, QSD
 (831) 772-5264
 Login or create an account To view email

Published 04/14/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.