ID 640587

Archived

2023 TOC for Flatwork & Street Improvements Pkg 1, San Antonio, TX

Bexar County

Owner Reference: 23-03808-03

Bid Date: 10/11/2022 at 02:00pm

Pre-Bid: 09/20/2022
Via WebEx. Join by phone: 1-415-655-0001 Meeting number (access code): 2450 747 3941 Meeting password: P8yJDeiVe28 and/or by utilizing https://www.webex.com/ using the aforementioned information.

Estimate: : $4,389,159.90 CoSA Base Bid: $4,190,569.90 ** SAWS Water: $189,285.00 ** SAWS Sewer: $9,305.004,389,159.90

Trades: General Engineering Contractor GEC, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47

Project construction may include but is not limited to: concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, wheel chair ramps, minor asphalt milling and replacement, removing and relocating mail boxes, topsoil, sodding, striping, elevated sidewalks, sidewalk pipe railing, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope. This task order construction contract shall be terminated four hundred and twenty (420) calendar days after acceptance of the first task order. The construction time (in calendar days) for each individual site will be negotiated between the City Engineer or Project Manager and the Contractor. Subcontractor/Supplier Utilization Commitment Form required. Small Business Economic Development Advocacy (SBEDA) Program applies. Bonds required. Prevailing wages.

City of San Antonio TX

Desiree Alderete
  (210) 207-8688
 210-207-4034
 Login or create an account To view email

Published 09/14/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.