24-Inch to 36-Inch Steel Cylinder Concrete Pipeline, El Paso, TX

El Paso County

Owner Reference: 40-22

Bid Date: 06/07/2022 at 01:30PM

Pre-Bid: 05/18/2022
The Pre-Bid meeting will be held via GoToMeeting. Please join the meeting from your computer, tablet, or smartphone using the link below: https://meet.goto.com/998412597

Estimate: $6,993,162.75 - $10,256,638.70

Trades: General Engineering Contractor GEC, Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Camera CCTV Inspections

The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: 1. Provision and installation of approximately 1,850 linear feet (LF) of new 24” ductile iron well collector pipeline and approximately 8,000 LF of new 30” ductile iron well collector pipeline. These segments of the project are referred to as “Corridor E” and will replace the existing well collector pipeline within these replacement limits. The exception is under the existing 8L-26R airport runway which was recently installed in 2014. The Corridor E pipeline will tie-in to this newly installed pipeline on both ends of the runway. The proposed well collector pipeline routing will be offset from the existing well collector pipeline and the existing well collector pipeline will be abandoned in place. 2. Provision and installation of approximately 3,300 linear feet (LF) of new 36” ductile iron well collector pipeline. This segment of the project is referred to as “Corridor D” and will replace the existing well collector pipeline within these replacement limits. The exception is under the existing 8L-26R airport runway which was recently installed in 2014. The Corridor D pipeline will tie-in to this newly installed pipeline on both ends of the runway. The proposed well collector pipeline routing will be offset from the existing well collector pipeline and the existing well collector pipeline will be abandoned in place. 3. The project includes installation of new intertie pipelines between existing pipelines and Corridor E and Corridor D in such a way that will simplify the valving configuration near the southernmost EPIA access road. The revised piping will allow EPWater to easily deliver water from the various airport wells to either the existing McRae Reservoir or Montana Reservoir with valve manipulation. 4. Also included in the project is installation of three portions of the pipelines by means of trenchless methods with installation of the pipeline within fiberglass casings Bonds required. Prevailing wages.

City of El Paso Water Utilities (EPWater) TX

Purchasing Dept.
 (915) 594-5627
 915-594-5689
 Login or create an account To view email

Published 05/11/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.