2B Cooling System Upgrade, Romeoville IL

Will County

Owner Reference: W912P620B0028

Bid Date: 09/25/2020 at 11:00AM

Pre-Bid: 09/09/2020
Webex: https://usace.webex.com/meet/ganiyat.f.leffler

Estimate: $500,000.00 - $1,000,000.00

The contractor will be required to replace the existing cooling system for the pulse generating system and rectifiers (cooling tower) and the filtration system with an air-cooled chiller package and plate and frame heat exchangers, at the Barrier IIIB. Bonds required, please refer to documents for further details about wage rates. This project encouraged MBE/WBE participation.

US Army Corps of Engineers IL

Annette H. Lakes
 (312) 846-5368
 (312) 886-5475
 Login or create an account To view email

Published 09/15/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.