ID 522042

Archived

34.5kV Cable Replacement and Fiber Optic Project, R Line, Contra Costa Co CA

Contra Costa County

Owner Reference: BARTD-15EJ-182

Bid Date: 11/03/2020 at 02:00pm

Pre-Bid: 12/19/2019
District's offices, at 300 Lakeside Drive, 17th floor conference room, Oakland, California

Estimate: $36.6M - $73.6M

6% MBE, 3.9% WBE goals. Work shall include providing all materials, labor, supervision, hardware, tools and equipment necessary for the replacement of sections of BART’s 34.5kV subtransmission system. Both the left and right circuits will be replaced between El Cerrito Plaza Substation (“RCP”) to RPD switching station (“RPD”), RPD to El Cerrito del Norte Substation (“RCN”) Traction power substation (“TPSS”), RCN to Richmond Substation (“RRI”) TPSS, and RRI to Richmond Yard Substation (“RRY”) TPSS. Concurrent with the subtransmission circuit replacement, the Contractor is to install isolation disconnect switches at RCP, RPD, RCN, RRI, and RRY substation locations. Additionally, two hundred eight-eight (288) strand fiber optic (“FO”) cable is to be installed connecting the train control rooms (“TCR”) at all passenger stations from RCP (“R40”) to RRY (“R65”).

Bay Area Rapid Transit District

Erica Elkington
 510.464.6390
 510.464.6011
 Login or create an account To view email

Published 08/07/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.