ID 629070
Archived
Salt Lake County
Owner Reference: SLCAIRE202218897
Bid Date: 06/09/2022 at 01:00PM
Trades: S200 - Electrical Contractor - Including Lighting and Possible High Voltage
Rocky Mountain Power (RMP) has requested the Airport to replace damaged sections of the Jordan 14 electrical circuit duct bank so that RMP can install new primary power conductors. This project will install new 8-way 6- inch electrical duct bank along with new 8-way 4-inch communications duct bank that will run parallel to the electrical duct bank. The duct banks will begin west of Runway 17/35 and run westbound south of the South Electrical Airfield Vault and end southeast of the Airport Operations Center (AOC). New electrical vaults and communication vaults will also be required along the new duct bank alignment. Bonds required.
City of Salt Lake City UT
Bob Bailey
(801) 535-6234
Login or create an account To view email
Published 05/17/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.