ID 629070

Archived

Airport Electrical & Communications Duct Bank from AOC to Gate 7, Salt Lake City, UT

Salt Lake County

Owner Reference: SLCAIRE202218897

Bid Date: 06/09/2022 at 01:00PM

Trades: S200 - Electrical Contractor - Including Lighting and Possible High Voltage

Rocky Mountain Power (RMP) has requested the Airport to replace damaged sections of the Jordan 14 electrical circuit duct bank so that RMP can install new primary power conductors. This project will install new 8-way 6- inch electrical duct bank along with new 8-way 4-inch communications duct bank that will run parallel to the electrical duct bank. The duct banks will begin west of Runway 17/35 and run westbound south of the South Electrical Airfield Vault and end southeast of the Airport Operations Center (AOC). New electrical vaults and communication vaults will also be required along the new duct bank alignment. Bonds required.

City of Salt Lake City UT

Bob Bailey
 (801) 535-6234
 Login or create an account To view email

Published 05/17/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.