ID 572642
Archived
San Diego County
Owner Reference: K-21-1953-DBB-3
Bid Date: 02/24/2021 at 02:00pm
Estimate: $2,700,000.00
ork will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair, raising appurtenances and survey monuments to grade, reconstruction survey monument box, sweeping, installation of curb ramps to meet ADA requirements, curb and gutter removal and replacement, sidewalk panel removal and replacement, cross gutter and alley apron removal and replacement, residential and commercial driveway replacement, curb outlet – type A placement, relocation of pedestrian push buttons, placement of pedestrian barricades, tree trimming, root pruning, tree root relocation and pneumatic soil excavation, installment of root barriers, tree removal, weed abatement, weed spraying, replacing traffic striping / markings/markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City. Project duration is 132 working days. Bonds required. Prevailing wages apply. Total SLBE & ELBE mandatory participation 15.1%
City of San Diego, Public Works Contracts, CA
Celina Suarez
(619) 533-6678
Login or create an account To view email
Published 01/27/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.